The N23D platform
One Rust-native runtime. Self-hosted. Offline-capable. Designed so mechanical, electrical, software, assets, service, architecture, and training share one change model.
Digital thread
Parts, revisions, commits, tickets, assets, courses, and architecture baselines link into one graph. Training can gate changes; changes can trigger learning.
Design & make
CAD (MCAD/ECAD path), manufacturing planning, and simulation belong in the same product — not five vendors and a spreadsheet.
Run the business on the same core
CRM, vault, repo, wiki, tasks, and chat sit under Command::Core identity and policy — not a bolt-on ACL per module.
Sovereignty
Local content-addressed storage + P2P sync. Cloud is optional, not mandatory. Built for teams that need auditability and edge/offline work.
Roadmap
N23D launches on 1 September 2027. That date is fixed. If the product is not shaped by then, it does not ship.
What ships: one native Rust binary, local-first, sold as a permanent license. It is built from scratch with minimal outside dependencies, and the goal is none. Every category is in the launch build: CAD, CAM, CAE, MAT, PLM, ERP, MES, QMS, PMO, CRM, TIX, CCB and BUS, on a shared Rust platform layer. HRM and ENT live inside BUS. PLC lives inside TIX. Nothing is deferred to a later release, and no module is shown as a tile without working behind it.
- Foundation (Sep to Nov 2026). Shared identity and ids, action stamps, the content-addressed store with first peer sync, and a real entry point in every category. Written, testable requirements for each module.
- Design and change depth (Dec 2026 to Feb 2027). CAD, CAM, PLM, CCB and MAT first: design, process, change and material identity working together. CAE, QMS and MES follow. ERP, CRM, PMO, BUS and TIX connect to real records.
- One thread across every category (Mar to May 2027). Every category brought up to the launch bar. The full path runs end to end: quote, design, change, make, quality, books.
- Hardening and launch (Jun to Sep 2027). Installers, docs, and failure drills. Code freeze for blockers only. Signed launch build, then the binary goes to the founding list on 1 September 2027. Known gaps are published honestly.
Progress is public in the build log. Dates move only when we say so here.
Simple license
$250 — permanent license for N23D 2026
Keep the build you buy. A new version ships each year; upgrade by purchasing that year’s release when you’re ready. Not a monthly SaaS subscription.
