Category: CAD
-

Verisurf 2027 Generates Inspection Plans Straight From QIF
Verisurf 2027 (Oct 6, 2026) builds CMM inspection plans directly from QIF files and keeps…
-

A Perfect Inspection Report Against the Wrong Revision Is Still a Reject
A clean CMM report means nothing if it measured Rev B after Rev C was…
-

Vestas Moves Supplier Design Reviews Into CoLab, Wired to Its PLM
Vestas signed a global contract with CoLab to run engineering and supplier design reviews on…
-

Shops Still Buy Software Once: eNET, Rhino and Alibre Outlast the Subscription Shift
eNET still sells its DNC software as an unlimited site license with no yearly maintenance…
-

ENOVIA R2026x FD04 Puts Gen 7 AI on Change, EBOM, and Portfolio
Dassault’s ENOVIA R2026x FD04 (Oct. 2, 2026) ships Gen 7 AI across change impact, generative…
-

An Orphan Simulation PDF Is Not Verification
A CAE report that never binds to the CAD revision is a souvenir, not verification.…
-

The Schedule Belongs on the Same Vault as the Part
Project schedule and Gantt milestones belong on the same local-first vault and part revision as…
-

Siemens Simcenter Testlab 2606 Cuts NVH Prediction Up to 60%
Siemens (Sept. 28, 2026) ships Simcenter Testlab 2606 / Neo next-gen workflows: up to 35%…
-

Toolpaths Belong on the Same Revision CAD Released
When CAM is a separate lease, every toolpath re-imports a STEP and invents a second…
-

GibbsCAM 2027 Ships Workspace Clarity, Chip Manager, and GO Operator
Sandvik’s GibbsCAM 2027 (global release ~mid-September 2026) lands under “More Clarity. More Control. More Confidence.”:…
