Category: CCB
-

In N23D, Check-In Is Save, Not Copy to a Folder
Most shops run PDM next to CAD and spend years teaching people to remember to…
-

Applicability Before Effectivity: The CCB Sequencing Failure That Creates Phantom Configurations
Martijn Dullaart and IpX’s CM2 line: answer applicability (which configurations) before effectivity (when cut-in). Mix…
-

In N23D, a New Revision Flags Every Toolpath It Breaks
When a designer releases a new revision, the toolpath, work order, and inspection plan should…
-

Accuris Connect Opens a PLM Change Request When a Standard Is Revised
Accuris Connect, launched October 6, puts governed standards inside Teamcenter, Windchill, Polarion, and Codebeamer and…
-

In N23D, the Customer Ticket Points at the Released Part
A customer complaint should not travel through CRM, a help desk, email, and PLM to…
-

USAF Teamcenter RFI Puts Weapon-System Change Control Front and Center
Air Force Sources Sought FA8770-26-R-B009-SS (responses due Sept. 18, 2026) asks industry how to harden…
-

Thirteen Change IDs Are Not an ECO
When CAD, PLM, ERP, and MES each stamp their own change number, the board votes…
-

Arena Ties ECO Reviews to Live BOMs and AI Redlines for Faster Change Boards
Arena by PTC (Sept. 8, 2026) connects ECOs to items, BOMs, drawings, and quality records,…
-

ISO 9001:2026 Is Live — Transition Clock Runs to Sept 30, 2029
ISO published ISO 9001:2026 on September 16, 2026. Certified manufacturers now have until September 30,…
-

Fisica Bets on Creo and Windchill for Post-Merger Configuration Control
PTC said Sept. 15, 2026 that Fisica Applied Technologies—defense antennas, EM systems, batteries after an…