Category: PLM
-

SSO Into Thirteen Suites Is Not One Platform
Logging into CAD, PLM, ERP, MES, and QMS with one IdP still leaves thirteen products…
-

1factory eQMS Ties Shop-Floor Inspection to CAPA and Audit Readiness
1factory’s Sept. 11, 2026 eQMS launch (ASSEMBLY Mag Sept. 29) unifies document control, training, CAPA,…
-

ENOVIA R2026x FD04 Puts Gen 7 AI on Change, EBOM, and Portfolio
Dassault’s ENOVIA R2026x FD04 (Oct. 2, 2026) ships Gen 7 AI across change impact, generative…
-

Enterprise PMOs Exit CapEx Spreadsheets for Asset Investment Planning
Planisware (Sept. 10, 2026) maps how enterprise PMOs leave CapEx spreadsheets for Asset Investment Planning—ERP-linked…
-

Ateios Ships E-Beam Electrodes From 50-MWh Indiana Line
Ateios Systems (Oct. 1, 2026) brings a 50-MWh/year electrode coating line online in Newberry, Indiana:…
-

Threekit Ships AI-Native CPQ for Complex Manufacturing Quotes
Threekit (Oct. 1, 2026) launches AI-Native CPQ for manufacturing: conversational configure-price-quote from specs, photos, voice…
-

An Orphan Simulation PDF Is Not Verification
A CAE report that never binds to the CAD revision is a souvenir, not verification.…
-

The Schedule Belongs on the Same Vault as the Part
Project schedule and Gantt milestones belong on the same local-first vault and part revision as…
-

Siemens Simcenter Testlab 2606 Cuts NVH Prediction Up to 60%
Siemens (Sept. 28, 2026) ships Simcenter Testlab 2606 / Neo next-gen workflows: up to 35%…
-

Toolpaths Belong on the Same Revision CAD Released
When CAM is a separate lease, every toolpath re-imports a STEP and invents a second…
